JAPAN-NUCLEAR-DISASTER-FUKUSHIMA-ENERGY-ENVIRONMENT

Akira Ono (R), plant chief for the Fukushima Dai-ichi nuclear power plant of Tokyo Electric Power Co. (TEPCO), speaks to the media at the main earthquake-proof building at the tsunami-crippled Fukushima Dai-ichi nuclear power plant in Okuma, Fukushima Prefecture, northeastern Japan on November 12, 2014. The final obstacle to restarting two nuclear reactors in Japan was removed on November 7 when local politicians granted approval for a plant to go back online, more than three years after the Fukushima disaster. AFP PHOTO / POOL / Shizuo Kambayashi (Photo credit should read SHIZUO KAMBAYASHI/AFP via Getty Images)
Akira Ono (R), plant chief for the Fukushima Dai-ichi nuclear power plant of Tokyo Electric Power Co. (TEPCO), speaks to the media at the main earthquake-proof building at the tsunami-crippled Fukushima Dai-ichi nuclear power plant in Okuma, Fukushima Prefecture, northeastern Japan on November 12, 2014. The final obstacle to restarting two nuclear reactors in Japan was removed on November 7 when local politicians granted approval for a plant to go back online, more than three years after the Fukushima disaster. AFP PHOTO / POOL / Shizuo Kambayashi (Photo credit should read SHIZUO KAMBAYASHI/AFP via Getty Images)
JAPAN-NUCLEAR-DISASTER-FUKUSHIMA-ENERGY-ENVIRONMENT
KÖP EN LICENS
Hur får jag använda den här bilden?
kr 4,200.00
SEK

INFORMATION

Begränsningar:
Kontakta ditt lokala kontor för all kommersiell eller marknadsföringsrelaterad användning. Fullständiga redaktionella rättigheter: Storbritannien, USA, Irland, Italien, Spanien och Kanada (ej Quebec). Begränsade redaktionella rättigheter i andra områden. Ring ditt lokala kontor.
Upphovsman:
SHIZUO KAMBAYASHI / Frilansare
Redaktionell fil nr:
458843082
Samling:
AFP
Datum skapat:
12 november 2014
Uppladdningsdatum:
Releaseinformation:
Saknar release. Mer information
Källa:
AFP
Kod:
POOL
Objektnamn:
Hkg10117810
Högsta tillåtna filstorlek:
3000 x 1999 bpkt (25,40 x 16,92 cm) - 300 dpi - 1 MB